SELECTION SUMMARY
도입 판단 요약
Special Condition S8.D of the 2007-2012 Phase I Municipal Stormwater Permit required permittees to collect and analyze data to evaluate pollutant loadings of stormwater discharged from different land uses: high density (HD) residential, low density (LD) residential, commercial, and industrial. To meet the S8.D requirement, Phase I Permittees collected water quality and flow data, sediment data, and toxicity information from stormwater discharges during storm events.
이 제품의 적합 용도와 제한 조건은 아직 검수하지 않았습니다. 태그와 카테고리는 찾아가는 길이지 적합성 보증이 아닙니다.
